Pictures 1-3 taken by Andrew Fields.
Pictures 4-19 taken by Michael Gillson.
Page written by Michael Gillson.
This is how the crossing looked in 2005. There were two Safetran mechanical bells at the time, although one isn't pictured. |
||
The crossing looks pretty much the same in March 2010 as it did in 2005. The only change was the replacement of a Safetran mechanical bell with a GS electronic bell. |
The upper set of lights are widely spaced. |
||
No changes were made to the lights. All of the lights consist of 12"x24" Harmon frames with Harmon dotted LEDs. |
|||
The remaining Safetran mechanical bell. |
The General Signals electronic bell. |
Both cantilevers were made by Safetran. |
|
Track view, facing West. |
Track view, facing East. |
This sign is posted ahead of the crossing. |
The relay cabinet, and the nearby casino. |
Pictures 1-3 taken during the summer of 2005.
Pictures 4-19 taken March 6, 2010.