Pictures 1-3 taken by Andrew Fields.

Pictures 4-19 taken by Michael Gillson.

 

Page written by Michael Gillson.

 

1

2

3

This is how the crossing looked in 2005. There were two Safetran mechanical bells at the time, although one isn't pictured.

4

5

6

7

The crossing looks pretty much the same in March 2010 as it did in 2005. The only change was the replacement of a Safetran mechanical bell with a GS electronic bell.
The upper set of lights are widely spaced.

8

9

10

11

No changes were made to the lights. All of the lights consist of 12"x24" Harmon frames with Harmon dotted LEDs.

12

13

14

15

The remaining Safetran mechanical bell.
The General Signals electronic bell.
Both cantilevers were made by Safetran.

16

17

18

19

Track view, facing West.
Track view, facing East.
This sign is posted ahead of the crossing.
The relay cabinet, and the nearby casino.

 

Pictures 1-3 taken during the summer of 2005.

Pictures 4-19 taken March 6, 2010.