Created August 21, 2007
Total Accidents: 2
Crossing DOT #: 260485N
TOTAL
DAILY TRAINS: 5 (AS OF 2008)
These photos were taken on August 16, 2007 by chicagorailfan@yahoo.com.
|
800x533 115 KB |
533x800 210 KB |
800x533 85.8 KB |
| Looking NorthWest. |
Looking at the soon to be wayside signal for the junction. All lights are L.E.Ds. |
A look at the crossing. |
These signals are 12"x24" Harmon lights with Harmon fading L.E.D. lights, and two US&S electronic bells that sound like General Signals Type 2 bells.
This crossing went over a major upgrade. Not that long ago, this crossing just had 2 crossbucks and 2 stop signs according to the FRA.
|
800x533 116 KB |
800x533 124 KB |
800x533 114 KB |
800x533 90.2 KB |
Another NorthWest View. |
A closeup of one of the signals. |
Another NorthWest view. |
Another closeup of the lights. |
|
800x533 63.3 KB |
533x800 169 KB |
800x533 79.3 KB |
800x533 110 KB |
More views of the front of the crossing. |
A searchlight style wayside signal is red with a wasp's nest in it. |
An EJ&E train is coming! |
|
|
800x533 81.3 KB |
800x533 113 KB |
800x533 98.6 KB |
800x533 101 KB |
The light now changes to yellow. |
The train activates a nearby crossing but has to stop to throw a switch to let it proceed. |
A side view. |
The signals activate! |
|
800x533 114 KB |
800x533 112 KB |
800x533 112 KB |
800x533 89.6 KB |
The train finally passes through. I wasn't told if the 4" gate lights are L.E.D. or not. |
|||
|
800x533 79.3 KB |
800x533 54.1 KB |
800x533 73.1 KB |
800x533 105 KB |
The train takes about 1-2 minutes to cross fully. |
|||
|
800x533 103 KB |
800x533 97.0 KB |
800x533 94.6 KB |
800x533 109 KB |
Facing Southwest on top of a pedestrian bridge. In about 10 minutes time, it dumps its load and comes back, activating the signals again. |
|||
CLICK THE ICON TO THE LEFT TO HEAR THE CROSSING IN ACTION. (RECORDED AUGUST 16, 2007) |
TOTAL TIME: 1:27 705 KB |