All pictures were taken by TrainmanKight on February 26, 2011.

 

1

2

3

A train approaches...
The signals activate. The GS type 2 e-bell silences when the gates fully lower.

 

Note: The train on the right side of the track in picture 1 is stopped for a drawbridge.

All lights and gate mechanisms are from Safetran. All lights are incandescent.

 

4

5

6

7

8

9

The train leaded by CSX 50 takes about 5-6 minutes to cross.

10

11

12

37 minutes later, another train, leaded by CSX 275 crosses.

13

14

15

16

17

18

Picture 18 shows another train approaching about an hour after CSX 275 crossed.

19

Here's the lead engine, CSX 7696. Notice on the right sign board, the "9" is smaller than the other numbers.