All pictures were taken by TrainmanKight on February 26, 2011.
A train approaches... |
The signals activate. The GS type 2 e-bell silences when the gates fully lower. | |
Note: The train on the right side of the track in picture 1 is stopped for a drawbridge.
All lights and gate mechanisms are from Safetran. All lights are incandescent.
The train leaded by CSX 50 takes about 5-6 minutes to cross.
|
||
37 minutes later, another train, leaded by CSX 275 crosses. |
||
Picture 18 shows another train approaching about an hour after CSX 275 crossed. |
||
| Here's the lead engine, CSX 7696. Notice on the right sign board, the "9" is smaller than the other numbers. | ||