|
These pictures were taken by TrainmanKight on January 15, 2010.
Overview of the crossing.
|
WCH 2nd generation LEDs. |
There's a Safetran gate mechanism here. |
The 12"x24" light frames and brackets are also by Safetran. |
The bell shown here is a rusty WCH mechanical bell. |
Another view of the signal. |
||
|
More views of the Safetran frames with WCH LEDs inside. |
No gate guards. |
||
More views from the other side of the crossing. This signal has the same characteristics as the other signal, except without a bell. Picture 16 also has no gate guards on it. |
|||
Track views.
|
|
| On February 20, 2010, the crossing was caught in action by TrainmanKight. Picture 23 shows the WCH LED and incandescent light in mid-flash. | |||||
|
|
|
|
|||
| Close-ups of the WCH LED and the incandescent light lit up. | |||||
|
|
|
|
|||
|
|
|
|
|||
|
|
|
||
| About 1 minute after the signals activate, the last train car passes. | |||