These pictures were taken by TrainmanKight on January 15, 2010.

 

1

2

3

4

Overview of the crossing.
WCH 2nd generation LEDs.
There's a Safetran gate mechanism here.
The 12"x24" light frames and brackets are also by Safetran.

5

6

7

8

The bell shown here is a rusty WCH mechanical bell.
Another view of the signal.

9

10

11

12

More views of the Safetran frames with WCH LEDs inside.

No gate guards.

13

14

15

16

More views from the other side of the crossing. This signal has the same characteristics as the other signal, except without a bell. Picture 16 also has no gate guards on it.

17

18

19

20

21

22

Track views.

 

23

24

25

On February 20, 2010, the crossing was caught in action by TrainmanKight. Picture 23 shows the WCH LED and incandescent light in mid-flash.

26

27

28

Close-ups of the WCH LED and the incandescent light lit up.

29

30

31

32

33

34

35

36

About 1 minute after the signals activate, the last train car passes.